Why it belongs in the disclosure package
San Francisco generally requires the report to be obtained and delivered for a residential sale or exchange. The DBI application describes the requirement and how to request it. Confirm the right building, addresses, and condo unit before ordering.
I’d read the report alongside the floor plan. If the marketing says two residences but the recorded use says one, that discrepancy belongs near the top of your questions.
A finished room is not the same as an approved unit
A lower-level kitchen, bath, and separate entrance may look like an apartment. The 3R is one part of determining what the city recognizes. Match it with approved plans, permit records, and final inspections.
For a specific example of how to approach that mismatch, read unpermitted unit. Don’t price the extra space as a separate legal dwelling simply because it has collected rent.
How I would use it before an offer
Make a short list of anything that doesn’t match: unit count, prior alterations, open work, or the current layout. Ask for the documents that resolve each item. A general assurance from the seller is less useful than the actual permit and approved plan.
Our guide to selling with unpermitted work explains the choices when the records and the building disagree. Keep the 3R, disclosures, and inspection findings together so the buyer sees the same story.
What to check
- Order the report for the correct building or condo interest.
- Compare recorded use with the actual layout.
- Resolve discrepancies through permit records and qualified review.