The layout has to fit the legal category
The HCD ADU Handbook, updated March 2026 explains the JADU framework, including its size, location, kitchen, and access requirements. A proposed conversion needs to be evaluated against those requirements.
I’d start with the home’s existing approved layout. A spare bedroom with a hot plate is not an approved second dwelling, and a detached backyard building is not a JADU.
Compare it with an ADU before choosing the design
A JADU and an ADU can create different layouts and obligations. State rules changed in 2026, so check the current occupancy, sanitation, and recorded-restriction requirements instead of reusing an old checklist.
Hypothetical example: an owner wants to separate part of a house for rental income. A shared-bathroom arrangement and a fully independent unit should be priced as different products, with different day-to-day operations.
Model the actual space and approval path
Budget design, permits, construction, utilities, and carrying time. Then estimate achievable rent for the approved layout, including any shared facilities. Check local implementation with SF Planning before committing to construction.
Our investment underwriting guide keeps the future income separate from today’s operations. If the space already exists without approval, begin with unpermitted unit and the permit record.
What to check
- Confirm the size, location, access, and kitchen configuration.
- Use current JADU rules, including occupancy and restriction requirements.
- Compare approved-layout rent with the full project cost.